We were involved at the initial design stage which allowed us to develop the design and positioning of the mechanical services and produce the optimum solution which would ensure that each apartment was identical and that the same high standard of installation quality could be replicated in each of the 474 apartments and penthouses.
The following solutions were produced and a test board was produced to see how this would translate into production.
After minor adjustments in the valve arrangement layout the optimal solution was agreed. We then started construction of the modules in our workshop which were then transported to the final location on site where they were fixed into position with the connecting pipe work. The following pictures show the construction in the workshop nd pipe layout.